LedgerOS · Phase 5 · Production Integration Blueprint

Readiness Scorecard

Ten dimensions scored 0–100. A green board is required before any real API mutation is enabled.

LedgerOS UI Design Lab · Phase 5 blueprint — no backend is connected. Every endpoint, permission, and event listed here is a design contract, not a live API.
Overall readiness
65%
Target 85% before draft-only mutations, 95% before cutover.
Design lab coverage
100%
Phases 1–4 shipped.
API contract map
85%
24 endpoints documented; 12 new, 4 extended, 8 existing.
Data model map
80%
20 entities mapped to mock objects.
Permission matrix
75%
11 route groups × 6 roles.
Integration contracts
55%
12 systems defined; 4 planned, 5 spec, 3 existing.
Event & draft matrix
70%
19 events classified into 6 behaviors.
Acceptance tests
40%
10 end-to-end suites defined; execution not started.
Security review
45%
Controls drafted; formal review pending.
Migration plan
60%
10-stage plan with entry/exit criteria.
Cutover plan
35%
Draft T-30 → T+7 checklist.